CNBT-1359 Project Scheduling
A study of conventional scheduling using critical-path-method; precedence and arrow networks; bar charts; monthly reports; and fast track scheduling. Lec 2, Lab 3, Cr 3
Outcomes
- Prepare flow chart diagrams using the precedence networks.
- Utilize the "forward pass" and "back pass" in-scheduling procedures.
- Construct bar charts.
- Calculate critical paths in scheduling.