CNBT-1359 Project Scheduling

A study of conventional scheduling using critical-path-method; precedence and arrow networks; bar charts; monthly reports; and fast track scheduling. Lec 2, Lab 3, Cr 3

Credits

3

Outcomes

  1. Prepare flow chart diagrams using the precedence networks.
  2. Utilize the "forward pass" and "back pass" in-scheduling procedures.
  3. Construct bar charts.
  4. Calculate critical paths in scheduling.